Palmetto Railways

Navy Base Intermodal Facility

COMMUNITY MITIGATION Our Commitments During Construction

During the Draft and Final Environmental Impact Statement (EIS) public comment periods, Palmetto Railways evaluated impacts on the natural and physical environment, and the relationship of people within that environment. To address some of these impacts, Palmetto Railways developed a Community Mitigation Plan to define commitments that Palmetto Railways will implement to avoid or minimize anticipated impacts on both the adjacent communities and natural environment. Elements of the Community Mitigation Plan are included as part of the Final EIS and Record of Decision, which was issued by the US Army Corps of Engineers (USACE).

Read the Final EIS

OUR COMMITMENTS

Adjacent Impacts

  • Noise abatement measures.

  • Contribution to The City of North Charleston of $8 million to mitigate the impacts to the adjacent communities including loss of Sterret Hall.

  • Minimize and avoid impacts to buildings and structures on the former Charleston Naval Complex.

  • Minimize and avoid direct interaction with historic buildings and structures.

  • Direct operating lights downward to shield light sources and minimize light impacts.

  • Install landscaping within and around the facility footprint to reduce visual impacts.

  • Provide stormwater capacity improvements through constructing new stormwater infrastructure where the existing systems are failing from lack of maintenance.

Traffic and Transportation

  • Extend Cosgrove Avenue with a new overpass; improvements to Bainbridge and Hobson intersection.

  • Turn lanes at Navy Base Intermodal Facility will minimize traffic delays.

  • Construct a private road to eliminate truck traffic on local roadways.

  • Locate roadway improvements to minimize/avoid at-grade crossings and traffic delays associated with rail operations.

  • Additional intermodal capacity will encourage rail use and reduce truck traffic on local roads.

  • Implement a Surface Transportation Study.

Quality of Life

  • Comply with the state's air quality requirements and conditions.

  • Implement dust control measures.

  • Reduction of truck traffic on local roads.

  • Provide around-the-clock security.

  • Develop detailed pollution prevention plans.

  • Conduct construction and operations in accordance with appropriate regulations, permits, and best practices.

  • Noise abatement measures along the western boundary of the site between Navy Base Intermodal Facility and adjacent neighborhoods.

  • State-of-the-art equipment to minimize sound emissions during operations.

  • Will support the city in setting up "Quiet Zones."

Construction Hours, Night Work, and Lane Closures

Palmetto Railways has committed to performing all construction activities during daylight hours six days a week, unless unforeseen or uncontrollable circumstances such as weather leading up to a task deadline require otherwise. All nighttime and Sunday work will be limited to every extent possible.

Notifications

If you would like to be notified about upcoming road closures and other potential effects from construction, please subscribe to our mailing list.